
Barco EX
By linking the Ex with other Event Master processors (E2 or S3-4K) you add input and output capacity, expanding the scaling and switching power of the entire system.
By linking the Ex with other Event Master processors (E2 or S3-4K) you add input and output capacity, expanding the scaling and switching power of the entire system.
+971 4 880 0092
© Copyright 2024 Production Technology LLC. All rights reserved.
© Copyright 2024 Production Technology LLC
Plot 548 - 597 Dubai Investment Park II,
PO BOX 71215, Dubai,
United Arab Emirates
+971 4 880 0092